Safety checks
No oil leaks - Clean up oil spillages using sawdust.
Make sure that all lights are working the operational area.
START UP
Turn button clock-wise to switch on machine
Turn control button on
Make sure the key is on
Press the start button.
LOADING PART INTO THE PRESS
Run first off from HUR4.
The first rod, insert the straight part into the left hand side into the press.
The second rod, insert the hooked part to the right hand side into the press.
Make sure that the two rods are properly secured - They are sitting into the grooves and in the correct position
*N.B it is crutial to place the part correctly in the grooves and correct position in order to be notched correctly.
Once rods are well secured press simultaneously the two-handed black buttons to activate the press machine.
Make “FIRST-OFF” sample.
Open B.I.S Card sign on and and conduct required inspection on the system.
Examples of NG parts that are not aceptable
QUALITY INSPECTION
REJECTS
Scrap / Reject bins are to be emptied at the end of end job or at the end of shift if the job is running at the end of shift
PERFORMANCE TARGETS
Once the job has been logged on the system, you will be able to see the production figures and targets including
The picture to the left provides and example.
Production figures are to be logged on the system every hour.