Line No. | Header Row | Instruction | |
1 |
|
SAFETY
Gloves and ear plugs are to be worn throughout this operation.

Be careful of pinch points. Keep fingers clear at all times when the machine is operating.
| Edit Delete |
2 |
|
- Switch on chiller.

- Wait for console to come on.

- Press red start icon botton.


- Wait for the water to reach up to level and turn blue.
| Edit Delete |
3 |
|


- Press "R" button on screen.

- Press motor symbols on to switch on hydraulics and temperature.

- Wait for the temperatures to come on

- Turn on temperatures by pressing "temperature setting" icon on Oztug screen.

- Switch on - "C13 - POM, C14 - POM, C15 - POM, C19 - PP, C20 - PP GATE, C20 - PP GROU" and wait to reach temperature.

- Once temperature is up, press on the temperature setting.

| Edit Delete |
4 |
|
SETUP & PREPARATION
-
- Process parameter indicate the correct manifold and nozzle temperatures.
- Ensure gate nozzles are turned off when not in use to avoid degradation of the plastic and carbonisation of nozzles..
- Turn the manifold temperatures on early to allow the heat to soak throughout the mould. Gate nozzles should be off during this process.
| Edit Delete |
5 |
|
- Press icon below to stop the machine cycle.
- Turn off motor by pressing the motor icon.

- Press temperature setting on the Oztug screen.

| Edit Delete |
6 |
|
SHUTOWN OF CHILLER
- Turn off the chiller by pressing the green icon on the screen.


|
| Edit Delete |