MANUFACTURING QUALITY CHART



COMPILED BY TEAM MEMBER 2
TEAM MEMBER 3 TEAM MEMBER 4
SUPPLIER Webroy (Pty) Ltd MQC No
CUSTOMER REV No.
PART NAME DATE INITIATED
PART No. REVISION DATE 2025/07/16
    LAST REVIEW DATE 
WEBROY STOCK CODE STATUS
MANUFACTURING LOCATION Webroy SAFETY CRITICAL
MQC TYPE
Current
Process Flow Key

Process TypeImage
PARTS STOCK
COMPONENT PART
PROCESS OPERATION
SAMPLING INSPECTION
100% INSPECTION
TRANSPORT
Responsible
Confirmation Level Key
NameImage
OPER
T/L
SUPERVISOR
MNGR
OPER
T/L
SUPERVISOR
MNGR


PROCESS FLOWNONAMEWORK ELEMENTCHECK ITEMRANKPROCESS CRITERIONINSPECTION METHODINSPECTION PLANFREQUENCYInspection No.(s)Work InstructionsRESPCHECK SHEETCONFIRM'N LEVELREACTION PLAN 
1Receiving raw material - Stores PersonnelReceiving.Raw material. Check for correct quantity delivered, type, Diameter. Check for COAVisual inspection and verification as per orderDelivery note and order.Every batch



1090
1090
1090
1090
Goods receive notebook / delivery note. Should there be any discrepancies inform production planner / supplier immediately and make a note on P.O.D.
2Move raw material to incoming inspection areaTransport.Raw material. Store material ccrrectlyVisual inspection.As per FIFO system.Every batch Visual inspection and FIFO. If difficulty occurs in storing raw material properly inform Stores Coordinator
3Inspection of raw material by QA personnel.Inspection.Raw material. SPEC. SAE1010 Material - WIRE/MBH2/0500 8.0mm +/- 0.08mm. Tensile range 550mpa to 750mpa. No pitted rust, no score marks, no excessive drawing soap.Visual inspection, micrometer.As per online incoming raw material inspection.Every batch 1059
1120
Record on inspection system. Any non-conforming raw material shall be placed on hold and isolated. Raise SRAN and inform Stores Coordinator.
4Move raw material to dedicated area for storage.Storage.Raw material. Safe stacking of wire coils on to racks as per allocated areas and FIFO system.Visual inspection.As per FIFO system.On receiving. FIFO and rack identification. Any difficulty experienced during this activity report to Stores Coordinator.
5Issue wire to production.Issuing.Raw material. SC Correct wire to be issued as per job card.Verification as per buff tag. Setter to measure wire diameter with vernier.Every coil issued to production.Every coil. Route card. Should the incorrect wire be issued to production stop process, correct and inform Stores Coordinator.
6Straighten & cut to lengthCut to lengthsProduct. SC Correct cut length - 586.00 mm +1.00/ -0.00 mm. No bow allowed. No burrs, sharp edges or score marks.Visual inspection, tape measure.As per work instructionFirst-off at start of production. In-process 9 parts every hour and last-off 23707
23708
23709
23707
23708
23709
1318
1318
Record on system. Should the first-off sample fail stop process and reset machine and re-do first-off.
7Move straight cut wire to wire formersTransportProduct Safe transportation of wiresVisual verificationN/AEvery order N/A Any difficulty experienced during this activity stop the process and report to Supervisor
8Form on twin headForming.Product. SC Form wire as per checking fixture, part shall sit flat in checking fixture and fit profile correctly. Correct length - as per checking fixture. No burrs, rust or score marks allowed. Refer CAR no. 53522.Visual inspection, checking fixture.As per work instructionFirst-off at start of production. In-process 9 parts every hour and last-off 23710
23711
23712
1314
Record on inspection system Should the first-off sample fail - stop process - reset machine and redo first-off. Any further non-conformance report to Supervisor
9Packing of final product.PackingProducts. Correct quantity: 200 parts per bin - bin type: 4616Visual.As per work instruction.Every job. F/A Card. Should the quantity be incorrect, stop process, verify quantity and add/remove products to meet quantity required.
10Transport parts to stores.TransportProducts. Correct bins and correct quantities.Visual inspection.As per works order.Every batch. F/A Card. Should difficulty occur during transport inform Supervisor.
11Receipting product into stores.Receipting.Products. Correct quantity to be entered on to the stock system.Visual.Every batch.Every order 1094
F/A Card. Any discrepancies shall be reported to the Stores Coordinator.
12Dispatching of parts.Transport.Products. Correct loading of bins and safe handling during transport activity.Visual.Entire order.Every order. 1101
Delivery note / invoice. Any difficulty experienced during this activity report to Stores Coordinator.
13Layout functional inspection.Inspection.Product. Full dimensional as per SDS.As per customer requirements.1 Complete product.As per schedule. 1180
Online Audit report Should the functional layout fail the Production manager shall be informed immediately.