PROCESS FLOW | NO | NAME | WORK ELEMENT | CHECK ITEM | RANK | PROCESS CRITERION | INSPECTION METHOD | INSPECTION PLAN | FREQUENCY | Inspection No.(s) | Work Instructions | RESP | CHECK SHEET | CONFIRM'N LEVEL | REACTION PLAN | |
| 1 | Receiving 6.00 mm Ferrule - Stores Personel | Receiving | 6.00 mm ferrule |
| Check for correct quantity delivered and size. | Visual inspection and verification as per order | Delivery note and order | Every batch |
|
1090
|
| Goods receive note book / delivery note |
| Should there be any discrepancies inform production planner / supplier immediately and make a note on P.O.D |
|
| 2 | Inspection of 6.00 mm Ferrule by Q.C. | Inspection | 6.00 mm ferrule |
SC
| No damage, distortion or burrs. Dimple must be present and centralized. Wire must fit in freely. | Visual inspection | Measure 5 components per batch. | Every batch |
20446
|
|
| Record on inspection sytem. |
| Any non-conforming ferrules shall be placed on hold and isolated. Raise SRAN and inform Stores Coordinator |
|
| 3 | Receiving raw material - Stores Personnel | Receiving | Raw material |
| Check for correct quantity delivered, type and diameter. | Visual inspection and verification as per order | Delivery note and order | Every batch |
|
1090
|
| Goods receive note book / delivery note |
| Should there be any discrepancies inform production planner / supplier immediately and make a note on P.O.D |
|
| 4 | Move material to receiving storage area | Transport | Raw material |
| Store material correctly | Visual inspection | As per FIFO system | Every batch |
|
|
| Visual inspection |
| If difficulty occurs in storing raw material properly inform Stores Coordinator |
|
| 5 | Inspection of raw material by QA personnel | Inspection | Raw material |
SC
| Spring steel wire. EN10204. WIRE/SBS3/0290. Correct diameter 2.90mm +/- 0.025. Correct tensile 1373 Mpa - 1618 Mpa. No score marks, no rust on wire. | Visual inspection, Micrometer | As per incoming raw material inspection QD207 | Every consignment |
6216
|
1120
|
| Goods receive notebook / Buff tag and record findings on electronic sytem |
| Any non-conforming raw material shall be placed on hold and isolated. Raise SRAN and inform Stores Coordinator |
|
| 6 | Move raw material to dedicated area for storage | Transport | Raw material |
| Safe stacking of wire coils as per allocated areas and FIFO system | Visual inspection | As per FIFO system | On receiving |
|
|
| Identification tags |
| Any difficulty experienced during this activity report to Stores Coordinator |
|
| 7 | Issue wire to production | Issuing | Raw material |
| Issue wire to production | Verification as per buff tag Setter to measure wire diameter with vernier | Every coil issued to production. | Every job as per request |
|
|
| Route card |
| Should the incorrect wire be issued to production stop process, correct and inform Stores Coordinator |
|
| 8 | Form wire | Forming | Wire |
SC
| Wire shall conform to drawing and wire profile must comply to checking fixture, Wire must be flat. Leg lengths must be correct on checking fixture. No rust, Score Marks and Burrs. | Visual Inspection and measure length with a tape measure. First-off verification by Q.A | As per work instruction | First-off at start of production. In-process 9 parts every hour and last-off |
174361743717438
|
1213
|
| Record on Electronic system |
| Should the first-off sample fail - stop process - reset machine and redo first-off. Any further non-conformance report to Supervisor |
|
| 9 | Transport wire to crimping press | Transport | Wire |
| Correct handling of parts during this activity | Visual verification | N/A | Every order |
|
|
| N/A |
| Any difficulty experienced during this activity stop the process and report to Supervisor |
|
| 10 | Assemble ferrule | Assembly | Completed parts |
| Crimping of ferrule | Part to meet drawing and customer requirements. Wire ends must be meet ferrule dimple to ensure correct crimping. Ferrule must be assembled/ crimped securely - Refer CAR 53441. | Visual verification | Every part |
|
1214
|
| Record on inspection system |
| Should the first-off sample fail - stop process - reset machine and redo first-off. Any further non-conformance report to Supervisor |
|
| 11 | Inspect part in final checking fixture | Inspection | Completed parts |
SC
| Part shall sit flat and comply to checking fixture. Ferrule to be crimped securely.
No rust, burrs, damage or distortion. | Visual inspection refer to work instruction for fitment requirements. | Visual verification in checking fixture for correct fitment & assembly. | First-off at start of production. In-process 9 parts every hour and last-off |
113821138311384
|
1214
|
| Record on inspection system |
| Should the inspection requirements not be correct, stop the process and inform the supervisor. |
|
| 12 | Pack assembled parts into bins | Packing | Completed parts |
| Correct quantity = 500 parts per bin.
Bin type: 4116 | Visual verification | As per packaging specification | Every order |
|
|
| F.A Card |
| Should the quantity be incorrect, stop process, verify quantity and add/remove products to meet quantity required |
|
| 13 | Transport completed parts to stores for dispatch | Transport | Completed parts |
| Correct quantities | Visual inspection | As per job order | Every order |
|
|
| N/A |
| Should difficulty occur during transport inform Supervisor |
|
| 14 | Receipt parts into stock | Receipting | Completed parts |
| Correct quantity to be entered on to the stock system | Visual verification. | Every batch. | Every order |
|
1094
|
| F.A Card. |
| Any discrepancies shall be reported to the Stores Coordinator |
|
| 15 | Dispatching of products | Transport | Completed parts |
| Bin type: 4116, QTY: 500 per bin | Visual verification | As per job order | Every order |
|
1101
|
| Delivery note / invoice |
| Any difficulty experienced during this activity report to Stores Coordinator |
|
| 16 | Layout functional inspection | Inspection | Parts |
| Full dimensional as per SDS and PIS. | As per customer requirements. | 1 complete product | As per schedule |
|
|
| Audit sheet |
| Should the audit fail, the Production manager shall be informed immediately. |
|