PROCESS FLOW | NO | NAME | WORK ELEMENT | CHECK ITEM | RANK | PROCESS CRITERION | INSPECTION METHOD | INSPECTION PLAN | FREQUENCY | Inspection No.(s) | Work Instructions | RESP | CHECK SHEET | CONFIRM'N LEVEL | REACTION PLAN | |
| 1 | Receiving raw material - Stores Personnel | Receiving | Raw material |
| Check for correct quantity delivered, type and diameter. | Visual inspection and verification as per order | Delivery note and order | Every batch |
|
1190
|
| Goods receive notebook / delivery note |
| Should there be any discrepancies inform production planner / supplier immediately and make a note on P.O.D |
|
| 2 | Move material to receiving storage area | Transport | Raw material |
| Store material correctly | Visual inspection | As per FIFO system | Every batch |
|
|
| Visual inspection and FIFO board |
| If difficulty occurs in storing raw material properly inform Stores Coordinator |
|
| 3 | Inspection of raw material by QA personnel | Inspection | Raw material |
| Correct material 4.0mm +/- 0.05mm mild wire. Specification - SAE1008. Tensile range - 530mpa to 630mpa. No pitted rust, no score marks, no excessive drawing soap | Visual inspection
Micrometer | As per incoming raw material inspection QD207 | Every consignment |
6116
|
1120
|
| Goods receive notebook / Buff tag and record findings on on-line inspection system. |
| Any non-conforming raw material shall be placed on hold and isolated. Raise SRAN and inform Stores Coordinator |
|
| 4 | Move raw material to dedicated area for storage | Transport | Raw material |
| Safe stacking of wire coils as per allocated areas and FIFO system | Visual inspection | As per FIFO system | On receiving |
|
|
| FIFO information board and rack identification |
| Any difficulty experienced during this activity report to Stores Coordinator |
|
| 5 | Issue wire to production | Issuing | Raw material |
SC
| Issue wire to production | Verification as per buff tag Setter to measure wire diameter with vernier | Every coil issued to production | Every coil |
|
|
| Route card |
| Should the incorrect wire be issued to production stop process, correct and inform Stores Coordinator |
|
| 6 | Form wire on Zukron | Forming | Product |
SC
|
All angles, bends and rotation must be correct to fit in correctly in checking fixture. First -Off matches the last - off. Angle and bends correct and fits into the fixture slots. Part leg is flat when placed on a flat surface. Appearance - No burrs, score marks, rust. | Visual inspection Checking fixture. Parts shall drop fit in checking fixture | First-off sample & In-process inspection and last-off | First-off at start of production. In-process 9 parts every hour to be verified in checking fixture and bundled |
7258725919442
|
1159
|
| Record on on-line inspection system |
| Should the first-off sample fail stop process and reset machine and re-do first-off |
|
| 7 | Packing of final product | Packing | Product |
| Pack parts in cardboard box - 500 per box.
Box type: WC1 | Visual verification. | as per customer requirement | Every job |
|
|
| F/A Card |
| Should the quantity be incorrect, stop process, verify quantity and add/remove products to meet quantity required |
|
| 8 | Transport product to stores | Transport | Product |
| Correct quantities | Visual inspection | As per works order | Every batch |
|
|
| F/A Card |
| Should difficulty occur during transport inform Supervisor |
|
| 9 | Receipting product into stores | Receipting | Product |
| Correct quantity to be entered on to the stock system | Visual verification. | Every batch | Every order |
|
1094
|
| F/A Card |
| Any discrepancies shall be reported to the Stores Coordinator |
|
| 10 | Dispatching of products | Transport | Product |
| Correct loading of bins and safe handling during transport activity | Visual verification | Entire order | Every order |
|
1101
|
| Delivery note / invoice |
| Any difficulty experienced during this activity report to Stores Coordinator |
|
| 11 | Internal product audit inspection | Inspection | Product |
SC
| As per drawing requirements | As per customer requirements | 1 Complete product | As per schedule |
|
|
| Audit sheet |
| Should the part fail to meet the requirements, the Production manager shall be informed immediately. |
|