Webroy Quality System
INDEX |
CARS |
GRID VIEW |
DASHBOARD |
PRODUCTION SYSTEM |
QUALITY MANUAL |
SUGGESTIONS |
MANUFACTURING QUALITY CHART
COMPILED BY
Compiled By
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 2
Team Member 2
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 3
Team Member 3
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 4
Team Member 4
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
SUPPLIER
Webroy (Pty) Ltd
MQC No
CUSTOMER
Customer
A001-Adient-Pasdec
C007-Gabriel
E010-Engineering Plastics
F001-Federal Mogul
F002-Feltex
H006-BT Industries
I002-Isringhausen
J002-Adient South Africa
L001-Lear
L016-L&J
N001-Nissan
R004-Ramsay
T004-Toyota Boshoku South Africa
T014-Toyota South Africa Motors
REV No.
PART NAME
DATE INITIATED
PART No.
REVISION DATE
2021/12/02
LAST REVIEW DATE
WEBROY STOCK CODE
STATUS
Select Status
PROTO-TYPE
PRE-LAUNCH
PRODUCTION
MANUFACTURING LOCATION
Webroy
SAFETY CRITICAL
MQC TYPE
Select MQC Type
Process
Product
Current
Process Flow Key
Process Type
Image
PARTS STOCK
COMPONENT PART
PROCESS OPERATION
SAMPLING INSPECTION
100% INSPECTION
TRANSPORT
Responsible
Confirmation Level Key
Name
Image
OPER
T/L
SUPERVISOR
MNGR
OPER
T/L
SUPERVISOR
MNGR
L&J
PROCESS FLOW
NO
NAME
WORK ELEMENT
CHECK ITEM
RANK
PROCESS CRITERION
INSPECTION METHOD
INSPECTION PLAN
FREQUENCY
Inspection No.(s)
Work Instructions
RESP
CHECK SHEET
CONFIRM'N LEVEL
REACTION PLAN
1
Receiving and verification of raw material
Receiving
Raw material
Check for correct quantity delivered, type and diameter
Visual inspection and verification as per order
Delivery note and order
Every batch
Goods receive notebook / delivery note
Should there be any discrepancies inform production planner / supplier immediately and make a note on P.O.D
2
Move material to receiving storage area
Transport
Raw material
Store material correctly
Visual inspection
As per FIFO system
Every batch
Visual inspection and FIFO board
If difficulty occurs in storing raw material properly inform Stores Coordinator
3
Inspection of raw material by QA personnel
Inspection
Raw material
Correct material 4.0mm +/- 0.05mm mild wire. Specification - SAE1008. Tensile range - 530mpa to 630mpa. No pitted rust, no score marks, no excessive drawing soap.
Visual inspection Micrometer
As per incoming raw material inspection QD207
Every consignment
6116
1120
Goods receive notebook / Buff tag and record findings on on-line inspection system
Any non-conforming raw material shall be placed on hold and isolated. Raise SRAN and inform Stores Coordinator
4
Move raw material to dedicated area for storage
Transport
Raw material
Safe stacking of wire coils on to racks as per allocated areas and FIFO system
Visual inspection
As per FIFO system
On receiving
FIFO information board and rack identification
Any difficulty experienced during this activity report to Stores Coordinator
5
Issue wire to production
Issuing
Raw material
SC
Issue wire to production
Verification as per buff tag Setter to measure wire diameter with vernier
Every coil issued to production
Every coil
Route card
Should the incorrect wire be issued to production stop process, correct and inform Stores Coordinator
6
Form wire on Zukron
Forming
Product
SC
Form wire as per checking fixture.
Visual inspection Checking fixture, parts shall drop fit in checking fixture
First-off sample & In-process inspection and last off
First-off at start of production. In-process 9 parts every hour to be verified in checking fixture and bundled
6232
6233
1153
Record on on-line inspections
Should the first-off sample fail stop process and reset machine and re-do first-off
7
Packing of final product
Packing
Product
Pack parts in cardboard box - 500 per box. Box type: WC1
As per checking fixture/ visual
as per customer requirement
Every job
F/A Card
Should the quantity be incorrect, stop process, verify quantity and add/remove products to meet quantity required
8
Transport product to stores
Transport
Product
Correct quantities
Visual inspection
As per works order
Every batch
F/A Card
Should difficulty occur during transport inform Supervisor
9
Receipting product to stores
Receipting
Product
Correct quantity to be entered on to the stock system
Visual
Every batch
Every order
F/A Card
Any discrepancies shall be reported to the Stores Coordinator
10
Dispatching of products
Transport
Product
Correct loading of bins and safe handling during transport activity
Visual
Entire order
Every order
Delivery note / invoice
Any difficulty experienced during this activity report to Stores Coordinator
11
Internal product audit inspection
Inspection
Product
SC
As per drawing requirements
As per customer requirements
1 Complete product
As per schedule
Audit sheet
Should the part fail to meet the requirements, the Production manager shall be informed immediately.
Process Flow
Select Process Flow
Process No
Process Name
Work Element
Check Item
Rank
Process Criterion
Inspection Method
Inspection Plan
Frequency
Responsible Person
Confirmation Level
Checksheet
Reaction Plan
Error
Approve Draft Document
Revision Comments :
Enter Pin No :
SAFETY FIRST
NEWS
Singakwenza Feedback Due
Marco Training Monday
Improvement Projects Due