Webroy Quality System
INDEX |
CARS |
GRID VIEW |
DASHBOARD |
PRODUCTION SYSTEM |
QUALITY MANUAL |
SUGGESTIONS |
MANUFACTURING QUALITY CHART
COMPILED BY
Compiled By
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 2
Team Member 2
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 3
Team Member 3
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 4
Team Member 4
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
SUPPLIER
Webroy (Pty) Ltd
MQC No
CUSTOMER
Customer
A001-Adient-Pasdec
C007-Gabriel
E010-Engineering Plastics
F001-Federal Mogul
F002-Feltex
H006-BT Industries
I002-Isringhausen
J002-Adient South Africa
L001-Lear
L016-L&J
N001-Nissan
R004-Ramsay
T004-Toyota Boshoku South Africa
T014-Toyota South Africa Motors
REV No.
PART NAME
DATE INITIATED
PART No.
REVISION DATE
2023/08/30
LAST REVIEW DATE
WEBROY STOCK CODE
STATUS
Select Status
PROTO-TYPE
PRE-LAUNCH
PRODUCTION
MANUFACTURING LOCATION
Webroy
SAFETY CRITICAL
MQC TYPE
Select MQC Type
Process
Product
Current
Process Flow Key
Process Type
Image
PARTS STOCK
COMPONENT PART
PROCESS OPERATION
SAMPLING INSPECTION
100% INSPECTION
TRANSPORT
Responsible
Confirmation Level Key
Name
Image
OPER
T/L
SUPERVISOR
MNGR
OPER
T/L
SUPERVISOR
MNGR
PROCESS FLOW
NO
NAME
WORK ELEMENT
CHECK ITEM
RANK
PROCESS CRITERION
INSPECTION METHOD
INSPECTION PLAN
FREQUENCY
Inspection No.(s)
Work Instructions
RESP
CHECK SHEET
CONFIRM'N LEVEL
REACTION PLAN
1
Receiving and verification of raw material
Receiving
Raw material
Check for correct quantity delivered, type and diameter
Visual inspection and verification as per order
Delivery note and order
Every batch
1090
Goods receive notebook / delivery note
Should there be any discrepancies inform production planner / supplier immediately and make a note on P.O.D
2
Move material to receiving storage area
Transport
Raw material
Store material correctly
Visual inspection
As per FIFO system
Every batch
Visual inspection and FIFO board
If difficulty occurs in storing raw material properly inform Stores Coordinator
3
Inspection of raw material by QA personnel
Issuing
Raw material
Spring steel wire. WIRE/SBS3/0200. Correct diameter 2.00mm ± 0.035. Correct tensile 1760 Mpa - 1970 Mpa. No score marks, no rust on wire.
Visual inspection Micrometer
As per incoming raw material inspection plan
Every consignment
6158
1120
Goods receive notebook / Buff tag and record findings on electronic sytem
Any non-conforming raw material shall be placed on hold and isolated. Raise SRAN and inform Stores Coordinator
4
Move raw material to dedicated area for storage
Transport
Raw material
Safe stacking of wire coils on to racks as per allocated areas and FIFO system
Visual inspection
As per FIFO system
On receiving
FIFO information board and rack identification
Any difficulty experienced during this activity report to Stores Coordinator
5
Issue wire to production
Issuing
Raw material
SC
Correct wire to be issued as per job card
Verification as per buff tag Setter to measure wire diameter with vernier
Every coil issued to production
Every coil
Route card
Should the incorrect wire be issued to production stop process, correct and inform Stores Coordinator
6
Form Springs on HTC 20 CNC
Forming
Product
SC
Form spring as per drawing
Measure spring dimensions with a vernier
As per drawing
1 part every hour
21508
21509
21510
Record on electronic system
Should the spring fail dimensionaly , stop process and re-set machine . Re-do first-off sample and inform supervisor
7
L.T.H.T
Stress relieve
Product
SC
Correct temperature @ 300 degrees for 15 minutes
Visual
As per requirements
Every job
21508
21509
21510
N/A
Any non-conformance shall be isolated - raise NCR put a hold card and be placed in quarantine store - Inform Supervisor
8
Inspection of springs
Inspection
Springs
Spring shall conform to drawing requirements
Measure required dimensions as per drawing
As per drawing
1 part every hour
Record on electronic system
Should the product be in correct, stop process and inform supervisor
9
Transport product to stores
Transport
Springs
Correct bins and correct quantities of 400 parts
Visual inspection
As per works order
Every batch
F/A Card
Should difficulty occur during transport inform Supervisor
10
Receipting Springs to stores
Receipting
Springs
Correct quantity to be entered on to the stock system
Visual
Every batch
Every order
F/A Card
Any discrepancies shall be reported to the Stores Coordinator
11
Dispatching of parts
Transport
Springs
Correct loading of bins and safe handling during transport activity
Visual
Entire order
Every order
Delivery note / invoice
Any difficulty experienced during this activity report to Stores Coordinator
12
Layout function inspection
Inspection
Springs
SC
Full dimensional
As per customer requirements
1 Complete product
As per schedule
Audit sheet
Should the functional layout fail the Production manager shall be informed immediately.
Process Flow
Select Process Flow
Process No
Process Name
Work Element
Check Item
Rank
Process Criterion
Inspection Method
Inspection Plan
Frequency
Responsible Person
Confirmation Level
Checksheet
Reaction Plan
Error
Approve Draft Document
Revision Comments :
Enter Pin No :
SAFETY FIRST
NEWS
Singakwenza Feedback Due
Marco Training Monday
Improvement Projects Due