Webroy Quality System
INDEX |
CARS |
GRID VIEW |
DASHBOARD |
PRODUCTION SYSTEM |
QUALITY MANUAL |
SUGGESTIONS |
MANUFACTURING QUALITY CHART
COMPILED BY
Compiled By
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 2
Team Member 2
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 3
Team Member 3
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 4
Team Member 4
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
SUPPLIER
Webroy (Pty) Ltd
MQC No
CUSTOMER
Customer
A001-Adient-Pasdec
C007-Gabriel
E010-Engineering Plastics
F001-Federal Mogul
F002-Feltex
H006-BT Industries
I002-Isringhausen
J002-Adient South Africa
L001-Lear
L016-L&J
N001-Nissan
R004-Ramsay
T004-Toyota Boshoku South Africa
T014-Toyota South Africa Motors
REV No.
PART NAME
DATE INITIATED
PART No.
REVISION DATE
2021/01/15
LAST REVIEW DATE
WEBROY STOCK CODE
STATUS
Select Status
PROTO-TYPE
PRE-LAUNCH
PRODUCTION
MANUFACTURING LOCATION
Webroy
SAFETY CRITICAL
MQC TYPE
Select MQC Type
Process
Product
Current
Process Flow Key
Process Type
Image
PARTS STOCK
COMPONENT PART
PROCESS OPERATION
SAMPLING INSPECTION
100% INSPECTION
TRANSPORT
Responsible
Confirmation Level Key
Name
Image
OPER
T/L
SUPERVISOR
MNGR
OPER
T/L
SUPERVISOR
MNGR
PROCESS FLOW
NO
NAME
WORK ELEMENT
CHECK ITEM
RANK
PROCESS CRITERION
INSPECTION METHOD
INSPECTION PLAN
FREQUENCY
Inspection No.(s)
Work Instructions
RESP
CHECK SHEET
CONFIRM'N LEVEL
REACTION PLAN
1
Receiving and verification of raw material
Receiving
Raw material
Check for correct quantity delivered, type and diameter
Visual inspection and verification as per order
Delivery note and order
Every batch
Goods receive notebook / delivery note
Should there be any discrepancies inform production planner / supplier immediately and make a note on P.O.D
2
Move material to receiving storage area
Transport
Raw material
Store material correctly
Visual inspection
As per FIFO system
Every batch
Visual inspection and FIFO board
If difficulty occurs in storing raw material properly inform Stores Coordinator
3
Inspection of raw material by QA personnel
Inspection
Raw material
Correct material 2mm +/- 0.035mm No pitted rust, now score marks, no excessive drawing soap
Visual inspection Micrometer
As per incoming raw material inspection QD207
Every consignment
Goods receive notebook / Buff tag and record findings on incoming receiving inspection sheet QD40
Any non-conforming raw material shall be placed on hold and isolated. Raise SRAN and inform Stores Coordinator
4
Move raw material to dedicated area for storage
Storage
Raw material
Safe stacking of wire coils on to racks as per allocated areas and FIFO system
Visual inspection
As per FIFO system
On receiving
FIFO information board and rack identification
Any difficulty experienced during this activity report to Stores Coordinator
5
Issue wire to production
Issuing
Raw material
SC
Correct wire to be issued as per job card
Verification as per buff tag Setter to measure wire diameter with vernier
Every coil issued to production
Every coil
Route card
Should the incorrect wire be issued to production stop process, correct and inform Stores Coordinator
6
Straighten and cut wire
Straighten and cut
Cut lengths of wire
SC
Wire cut to 576mm +/- 1mm and must be straight.
Measure with Tape measure Visual inspection
As per work instruction
2 wires every 30 minutes
Record first-off and in-process inspection on BIS card
Should the first-off sample fail stop process and reset machine and re-do first-off
7
Bundle wire
Bundling
Cut lengths of wire
Correct quantities per bundle
Visual
As per work instructions
Every job
BIS Card
Should the quantities be incorrect, stop process and verify quantities
8
Transport wire cut to production to form wire form
Transport
Cut lengths of wire
Safe handling of wire bundles during activity
Visual
Visual
Every batch
N/A
Any difficulty during activity inform supervisor
9
Form bends on wire form on Twin head machine
Forming
Wire form
SC
Form bends as per checking fixture.
Visual inspection Checking fixture
First-off sample & In-process inspection
First-off at start of production. In-process 9 parts every hour to be verified in checking fixture and bundled
Record on Attribute sampling sheet QD:203
Should the first-off sample fail stop process and reset machine and re-do first-off
10
Transport wire forms to production to form hooks on Bowers
Transport
Wire form
Safe handling of wire forms during activity
Visual
Visual
Every batch
N/A
Any difficulty during activity inform supervisor
11
Form hooks and bundle
Forming and bundling
Product
Correct length of hook = 15.1mm +/- 1 and correct hook width = 8.5mm +/- 1 as per drawing
Measure with a vernier and verify fitment in checking fixture
As per work instructions
2 parts every hour
BIS Card
Should the product be incorrect, stop process and inform supervisor
12
Transport product to stores
Transport
Product
Correct bins and correct quantities of 200 parts
Visual inspection
As per works order
Every batch
F/A Card
Should difficulty occur during transport inform Supervisor
13
Receipting product to stores
Receipting
Product
Correct quantity to be entered on to the stock system
Visual
Every batch
Every order
F/A Card
Any discrepancies shall be reported to the Stores Coordinator
14
Dispatching of products
Transport
Product
Correct loading of bins and safe handling during transport activity
Visual
Entire order
Every order
Delivery note / invoice
Any difficulty experienced during this activity report to Stores Coordinator
15
Layout functional inspection
Inspection
Product
SC
Full dimensional
As per customer requirements
1 Complete product
As per schedule
Audit sheet
Should the functional layout fail the Production manager shall be informed immediately.
Process Flow
Select Process Flow
Process No
Process Name
Work Element
Check Item
Rank
Process Criterion
Inspection Method
Inspection Plan
Frequency
Responsible Person
Confirmation Level
Checksheet
Reaction Plan
Error
Approve Draft Document
Revision Comments :
Enter Pin No :
SAFETY FIRST
NEWS
Singakwenza Feedback Due
Marco Training Monday
Improvement Projects Due