PROCESS FLOW | NO | NAME | WORK ELEMENT | CHECK ITEM | RANK | PROCESS CRITERION | INSPECTION METHOD | INSPECTION PLAN | FREQUENCY | Inspection No.(s) | Work Instructions | RESP | CHECK SHEET | CONFIRM'N LEVEL | REACTION PLAN | |
| 1 | Receiving and verification of raw material | Receiving | Raw material |
| Check for correct quantity delivered, type and diameter | Visual inspection and verification as per order | Delivery note and order | Every batch |
|
1090
|
| Goods receive notebook / delivery note |
| Should there be any discrepancies inform production planner / supplier immediately and make a note on P.O.D |
|
| 2 | Move material to receiving storage area | Transport | Raw material |
| Store material correctly | Visual inspection | As per FIFO system | Every batch |
|
|
| Visual inspection and FIFO board |
| If difficulty occurs in storing raw material properly inform Stores Coordinator |
|
| 3 | Inspection of raw material by QA personnel | Inspection | Raw material |
| Part No. WIRE/MBH1/0710
SPEC. TSG3533G material
SAE 1010. 7.1mm +/- 0.08mm. Tensile range - 500mpa to 750mpa
No pitted rust, no score marks, no excessive drawing soap
| Visual inspection
Micrometer | As per incoming raw material inspection | Every consignment |
1067
|
1120
|
| Goods receive notebook / Buff tag and record findings on incoming receiving inspection No. 1067 |
| Any non-conforming raw material shall be placed on hold and isolated. Raise SRAN and inform Stores Coordinator |
|
| 4 | Move raw material to dedicated area forstorage | Storage | Raw material |
| Safe stacking of wire coils on to racks as per allocated areas and FIFO system | Visual inspection | As per FIFO system | On receiving |
|
|
| FIFO information board and rack identification |
| Any difficulty experienced during this activity report to Stores Coordinator |
|
| 5 | Issue wire to production | Issuing | Issuing |
| Correct wire to be issued as per job card | Verification as per buff tag
Setter to measure wire diameter with vernier | Every coil issued to production | Every coil |
|
|
| Route card |
| Should the incorrect wire be issued to production stop process, correct and inform Stores Coordinator |
|
| 6 | Form wire on Huron 4 | Forming | Product |
SC
| Form wire as per checking fixture...
Overall length = 666 +/- 2mm | Visual inspection
Checking fixture | Frst-off sample & In-process inspection
| First-off at start of production. In-process 9 parts every hour and last off |
1068206614409
|
1058
|
| Tag first-off and record first-off and in-process inspection on system |
| Should the first-off sample fail stop process and reset machine and re-do first-off |
|
| 7 | Chamfer end | Chamfering | Chamfer |
| Chamfer present on end | Visual | First off, In process & Last off inspections | First-off at start of production. In-process 1 parts every hour and last-off |
204492045020451
|
|
| Record First-off, In-process and Last off inspection on system |
| Any difficulty chamfering stop process and inform supervisor |
|
| 8 | Notch end | Notching | Notch |
| Correct dimensions on notch -Thickness = 5.6mm Minimum.
| Visual check
| First-off sample
In-process inspection | First-off at start of production. In-process inspection and last off. Burrs check 1 part every hour while notching |
1069206814410
|
|
| Record first-off and in-process inspection on system |
| Any difficulty notching stop process and inform supervisor |
|
| 9 | Stamp butterfly, flattern ends and form angle. | Stamping, flatterning and forming angle | butterfly, flattern ends and angle |
| Correct dimensions:
Flattend width = 9.3mm - 0.3mm.,
Butterfly = 2.5mm REF.
Flatterned ends = As per GO/NO GO gauge on fixture | Visual verification on checking fixture | First-off sample.
In-process inspection | First off at start of production .in process 1 every hour and keep a larst of at the end of production run |
1070207014411
|
1059
|
| Tag first-off and record first-off and in-process inspection on system. |
| Any difficulty, stop process and inform supervisor |
|
| 10 | Packing of final product | Packing | Completed product |
| correct quantity | Visual | as per customer requirement | Every job |
|
|
| F/A Card |
| Should the quantity be incorrect, stop process, verify quantity and add/remove products to meet quantity required |
|
| 11 | Transport product to stores | Transport | Products |
| Correct bins and correct quantities | Visual inspection | As per works order | Every batch |
|
|
| F/A Card |
| Should difficulty occur during transport inform Supervisor |
|
| 12 | Receipting product to stores | Receipting | Products |
| Correct quantity to be entered on to the stock system | Visual | Every batch | Every order |
|
1094
|
| F/A Card |
| Any discrepancies shall be reported to the Stores Coordinator |
|
| 13 | Dispatching of products | Transport | Transport |
| Correct loading of bins and safe handling during transport activity | Visual | Entire order | Every order |
|
1101
|
| Delivery note / invoice |
| Any difficulty experienced during this activity report to Stores Coordinator |
|
| 14 | Layout functional inspection | Inspection | Product |
SC
| Full dimensiomal | As per customer requiremetns | 1 Complete product | As per schedule |
|
|
| Audit sheet |
| Should the functional layout fail the Production manager shall be informed immediately. |
|