Webroy Quality System
INDEX |
CARS |
GRID VIEW |
DASHBOARD |
PRODUCTION SYSTEM |
QUALITY MANUAL |
SUGGESTIONS |
MANUFACTURING QUALITY CHART
COMPILED BY
Compiled By
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 2
Team Member 2
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 3
Team Member 3
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 4
Team Member 4
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
SUPPLIER
Webroy (Pty) Ltd
MQC No
CUSTOMER
Customer
A001-Adient-Pasdec
C007-Gabriel
E010-Engineering Plastics
F001-Federal Mogul
F002-Feltex
H006-BT Industries
I002-Isringhausen
J002-Adient South Africa
L001-Lear
L016-L&J
N001-Nissan
R004-Ramsay
T004-Toyota Boshoku South Africa
T014-Toyota South Africa Motors
REV No.
PART NAME
DATE INITIATED
PART No.
REVISION DATE
2023/09/21
LAST REVIEW DATE
WEBROY STOCK CODE
STATUS
Select Status
PROTO-TYPE
PRE-LAUNCH
PRODUCTION
MANUFACTURING LOCATION
Webroy
SAFETY CRITICAL
MQC TYPE
Select MQC Type
Process
Product
Current
Process Flow Key
Process Type
Image
PARTS STOCK
COMPONENT PART
PROCESS OPERATION
SAMPLING INSPECTION
100% INSPECTION
TRANSPORT
Responsible
Confirmation Level Key
Name
Image
OPER
T/L
SUPERVISOR
MNGR
OPER
T/L
SUPERVISOR
MNGR
PROCESS FLOW
NO
NAME
WORK ELEMENT
CHECK ITEM
RANK
PROCESS CRITERION
INSPECTION METHOD
INSPECTION PLAN
FREQUENCY
Inspection No.(s)
Work Instructions
RESP
CHECK SHEET
CONFIRM'N LEVEL
REACTION PLAN
1
Receiving and verification of raw material
Receiving
Receiving
Check for correct quantity delivered, Material 9mm Mild Steel wire in coil form
Visual inspection and verification as per order
Delivery note and order
Every batch
Goods receive notebook / delivery note
Should there be any discrepancies inform production planner / supplier immediately and make a note on P.O.D
2
Move material to receiving storage area
Transport
Transport
Store material correctly
Visual inspection
As per FIFO system
Every batch
Visual inspection and FIFO board
If difficulty occurs in storing raw material properly inform Stores Coordinator
3
Inspection of raw material by QA personnel
Inspection
Inspection
Mid Black Wire WIRE/MBH1/0900 9mm +/- 0.08mm. Material- SAE 1008. Tensile range 550mpa to 750mpa - correct diameter No score marks - no rusty wire, Correct grade, correct tensile - verify material compositions as per spec
Visual inspection Micrometer for wire diameter COA from supplier - record findings on incoming inspection document
As per incoming raw material inspection QD207
Every consignment
1047
1120
Goods receive notebook / Buff tag and record findings on incoming receiving inspection no. 1047
Any non-conforming raw material shall be placed on hold and isolated. Raise SRAN and inform Stores Coordinator
4
Move raw material to dedicated area forstorage
Storage
Storage
Safe stacking of wire coils on to racks as per allocated areas and FIFO system
Visual inspection
As per FIFO system
On receiving
FIFO information board and rack identification
Any difficulty experienced during this activity report to Stores Coordinator
5
Issue wire to production
Issuing
Issuing
SC
Correct wire to be issued as per job card
Verification as per buff tag Setter to measure wire diameter with vernier
Every coil issued to production
Every coil
Route card
Should the incorrect wire be issued to production stop process, correct and inform Stores Coordinator
6
Straighten wire and cut to length
Cutting
Cut lengths
SC
Correct cut length = 420mm +/- 1mm
Visual inspection Measure with tape measure
First-off sample In-process inspection
Every batch
1051
2074
22524
Record first-off and in-process inspection 1 part every hour record on BIS card
Should the first-off sample fail stop process and reset machine and re-do first-off
7
Move part to chamfer tool
Transport
Bent wire form
Safe transportation of wires
Visual Inspection
Every batch
Every batch
NA
Any difficulty report to the supervisor
8
Chamfer ends
Chamfer
Chamfered Wire
Chamfer ends. Top Chamfer 1mm +- 0.5mm Bottom Chamfer 1mm +- 0.5mm
As per work instruction - 1051 Measure with a Vernier
First-off In process inspection
Every batch
1052
1056
22527
1051
Record First off and in process inspection 1 part every hour record on BIS card
Any difficulty report to the supervisor
9
Form bends 1 and 2
Forming
formed bend 1 - loop and 2 kink
Correct length as per drawing , as per fitment on in-process checking fixture.
Visual Inspection. As per work instruction - 1054. Verify fitment on in-process checking fixture
First-off sample In-process inspection
Every Batch
1053
1057
22525
1054
Record every hour on BIS Card
Any difficulty report to supervisor
10
Flatten and form radius
Press
Press Wire Form
Correct radius Correct diameter of flattened wire Must conform to checking fixture. No unformed parts left lying around that can get mixed in the bin with finished parts. 5S and good housekeeping to ensure separation of good and bad parts.
Visual inspection. As per work instruction - 1049.
First off In process inspection
Every Batch
1054
1058
22526
1049
Record First-off and In Process Inspection every hour on BIS card
Any difficulty report to supervisor
11
Sub-Contract part for Galvanising
Sub-Contract Process
Pressed Wire
Safe handling of part during transport to sub contractor
Visual Inspection
Visual Inspection
Every batch
NA
Any issue report to production manager
12
Receive plated part from sub contractor
Receiving
Plated Part
Correct Plating Plating Thickness 5 to 60 microns
Visual Inspection
Sampling Inspection during receiving
Every batch
1055
Receiving Inspection Sheet
Any issues report to production planner and quality team leader
13
Receipting product to stores
Receipting
Receipting
Correct quantity to be entered on to the stock system
Visual
Every batch
Every order
F/A Card
Any discrepancies shall be reported to the Stores Coordinator
14
Packing of final product
Packing
Packing
40 Parts per bin Plastic bin size 4616
Visual
As per work instruction
Every job
F/A Card
Should the quantity be incorrect, stop process, verify quantity and add/remove products to meet quantity required
15
Dispatching of products
Transport
Transport
Correct loading of bins and safe handling during transport activity
Visual
Entire order
Every order
Delivery note / invoice
Any difficulty experienced during this activity report to Stores Coordinator
16
Layout functional inspection
Inspection
Inspection
SC
Full dimensiomal
As per customer requiremetns
1 Complete product
As per schedule
Audit sheet
Should the functional layout fail the Production manager shall be informed immediately.
Process Flow
Select Process Flow
Process No
Process Name
Work Element
Check Item
Rank
Process Criterion
Inspection Method
Inspection Plan
Frequency
Responsible Person
Confirmation Level
Checksheet
Reaction Plan
Error
Approve Draft Document
Revision Comments :
Enter Pin No :
SAFETY FIRST
NEWS
Singakwenza Feedback Due
Marco Training Monday
Improvement Projects Due