PROCESS FLOW | NO | NAME | WORK ELEMENT | CHECK ITEM | RANK | PROCESS CRITERION | INSPECTION METHOD | INSPECTION PLAN | FREQUENCY | Inspection No.(s) | Work Instructions | RESP | CHECK SHEET | CONFIRM'N LEVEL | REACTION PLAN | |
| 1 | Receiving and verification of raw materials by stores personel | Receiving | Raw material |
| Check for correct quantity delivered, type and diameter | Visual inspection and verification as per order | Delivery Note and order | Every Batch |
|
1090
|
| Goods Receive Note Book / Delivery Note |
| Should there be any discrepancies - inform Production planner / supplier immediately and make note on POD |
|
| 2 | Move material to receiving storage area | Transport | Raw material |
| Store material correctly | Visual Inspection | As per FIFO System | Every Batch |
|
|
| Visual inspection and FIFO board |
| If difficulty occurs in storing raw material properly, inform Stores coordinator |
|
| 3 | Inspection of raw material by QA personel | Inspection | Inspection |
SC
| Spring black wire. TSG 3531G - SWB.WIRE/SBS3/0380 & WIRE/SBS3/0500. correct diameter 3.8mm +/- 0.035 and 5mm +/- 0.045. No score marks, no rust on wire. Correct tensile 3.8mm = 1373mpa to 1569mpa and 5mm = 1460mpa to 1650mpa. | Visual Inspection / Micrometer | As per incoming raw material inspection plan QD207 | Every consignment |
60806081
|
1120
|
| Goods Receive Note Book / Buff tag and record findings on electronic system |
| Any non-conforming raw material shall be isolated. Raise a SRAN and inform stores coordinator |
|
| 4 | Move raw material to dedicated area for storage | Storage | Raw material |
| Safe stacking of wire coils as per allocated areas and FIFO system | Visual Inspection | As per FIFO System | On receiving |
|
|
| FIFO information board and rack identification |
| Any difficulty experienced during this activity report to Stores Coordinator |
|
| 5 | Issue wire to production | Issuing | Raw material |
| Correct wire to be issued as per route card. | Verification as per buff tag.
Setter to verify wire diameter with Vernier. | Every coil issued to production. | Every job as per request |
|
|
| Route Card |
| Should the incorrect wire be issued to production, stop the process, correct and inform Stores coordinator. |
|
| 6 | Straighten and cut wire to length | Straighten and cut | Cut lengths |
| Correct length = 262.5mm - 263mm
No burrs on ends
Wire must be straight, no twist | Measure with tape measure.
Visual inspection for burrs and straightness | First-off sample In-process inspection | First-off at start of production. In-process 1 part every hour and last off |
61256126
|
|
| Record on line inspection system |
| Should the first-off sample fail stop process and reset machine and re-do first-off |
|
| 7 | Form wire on Wire Former | Forming | Wire forms |
SC
| Form wires | Visual inspection | As per work instruction | First-off at start of production, in-process 1 part every hour and last off |
6082608612392
|
1117
|
| Record on electronic system |
| Should the first-off sample fail, stop process and reset machine and re do first-off sample and inform supervisor |
|
| 8 | Induction heat treatment of wire after forming | Heat treatment | Temperature |
SC
| Induction heat wire after forming at 300°C +20°C | Digital infrared thermometer | Temperature of induction heating | Weekly |
22542
|
|
| Record of online inspection |
| Any difficulty experienced during this activity stop the process and report to supervisor |
|
| 9 | Load wire forms on kanban | Loading | Wire forms |
| Load wires correctly on kanban | Visual inspection | Full Kanban | Every batch |
|
|
| NA |
| Any difficulty experienced during this activity stop the process and report to team leader |
|
| 10 | Load wire forms into mould | Loading | Wire forms |
| As per work instruction | Visual inspection | Every batch | Every part |
|
|
| N/A |
| Any difficulty experienced during this activity stop the process and report to team leader |
|
| 11 | Moulding of wire forms | Moulding | Wire forms |
| Correct injection as per requirement.
Correct mould parameters .
Ensure gate nozzles are turned off when not in use to avoid degradation of the plastic and carbonisation of nozzles. | Visual Inspection | As per job requirement | Every part |
23619
|
1260
|
| N/A |
| Any difficulty experienced during this activity stop the process and report to team leader |
|
| 12 | Strip part from mould and inspect | Stripping and inspecting | Moulded wire forms |
| Correct injection.
No missing pieces of plastic.
No sprue & sharp edges.
Overmoulded wires completely covered, look for under shooting.
Operator initial on R/H side plastic moulded piece.The center part of the mould plastic not burnt & sticky.
No short shots. | Visual Inspection and verification on final checking fixture.
First-off verification by Q.A
| First-off inspection In process inspection and last off | Every batch |
6085608812391
|
1261
|
| Record on electronic system |
| Any difficulty experienced during this activity stop the process and report to team leader |
|
| 13 | Load parts into bin | Packing | Completed parts |
| Correct quantity 15 parts per bin / 25 bins per pallet. Bin No. 4633 | Visual inspection | As per works order | Every job as per request |
|
|
| FA Card |
| Any difficulty experienced during this activity stop the process and report to team leader |
|
| 14 | Transport part to stores | Transport | Completed parts |
| Correct bins and correct quantity | Visual in spection | As per works order | Every job as per request |
|
|
| FA Card |
| Should any difficulty occur during transportation inform supervisor |
|
| 15 | Receipt parts into stores | Receipting | Completed parts |
| Correct quantity to be entered into stock system | Visual | Every job | Every order |
|
1094
|
| FA Card |
| Any discrepancy shall be reported to stores coordinator |
|
| 16 | Dispatching of parts | Transport | Transport |
| Correct loading of boxes and safe handling during transport activity | Visual | Every job | Every order |
|
1101
|
| Delivery note / Invoice |
| Any difficulty experienced during this activity stop the process and report to Stores coordinator |
|
| 17 | Layout function inspection | Inspection | Inspection |
| Full dimensional | As per drawing and customer requirements | 1 Complete part | As per schedule |
|
|
| Audit sheet |
| Should the functional layout fail, the production manager shall be reported immediately. |
|