Webroy Quality System
INDEX |
CARS |
GRID VIEW |
DASHBOARD |
PRODUCTION SYSTEM |
QUALITY MANUAL |
SUGGESTIONS |
MANUFACTURING QUALITY CHART
COMPILED BY
Compiled By
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 2
Team Member 2
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 3
Team Member 3
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 4
Team Member 4
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
SUPPLIER
Webroy (Pty) Ltd
MQC No
CUSTOMER
Customer
A001-Adient-Pasdec
C007-Gabriel
E010-Engineering Plastics
F001-Federal Mogul
F002-Feltex
H006-BT Industries
I002-Isringhausen
J002-Adient South Africa
L001-Lear
L016-L&J
N001-Nissan
R004-Ramsay
T004-Toyota Boshoku South Africa
T014-Toyota South Africa Motors
REV No.
PART NAME
DATE INITIATED
PART No.
REVISION DATE
2022/12/13
LAST REVIEW DATE
WEBROY STOCK CODE
STATUS
Select Status
PROTO-TYPE
PRE-LAUNCH
PRODUCTION
MANUFACTURING LOCATION
Webroy
SAFETY CRITICAL
MQC TYPE
Select MQC Type
Process
Product
Current
Process Flow Key
Process Type
Image
PARTS STOCK
COMPONENT PART
PROCESS OPERATION
SAMPLING INSPECTION
100% INSPECTION
TRANSPORT
Responsible
Confirmation Level Key
Name
Image
OPER
T/L
SUPERVISOR
MNGR
OPER
T/L
SUPERVISOR
MNGR
PROCESS FLOW
NO
NAME
WORK ELEMENT
CHECK ITEM
RANK
PROCESS CRITERION
INSPECTION METHOD
INSPECTION PLAN
FREQUENCY
Inspection No.(s)
Work Instructions
RESP
CHECK SHEET
CONFIRM'N LEVEL
REACTION PLAN
1
Receiving and verification of mould plates.
Receiving Inspection
Mould Plates
As per Inspection records 3076
Visual and Outer Dimension Inspection
As per Work Instrution
Every Batch
1090
Online Inspection Records
Any non conforming Mould plates found shall be placed on HOLD and Isolated. Raise SRAN and inform Stores and Production Planner.
2
Receiving and verification of raw material by stores personel
Receiving
Raw material
Check for correct quantity delivered, type and diameter
Visual inspection and verification as per order
Delivery Note and order
Every Batch
1090
Goods Receive Note Book / Delivery Note
Should there be any discrepancies - inform Production planner / supplier immediately and make note on POD
3
Move material to receiving storage area
Transport
Raw material
Store material correctly
Visual Inspection
As per FIFO System
Every Batch
Visual inspection and FIFO board
If difficulty occurs in storing raw material properly, inform Stores coordinator
4
Inspection of raw material by QA personel
Inspection
Raw Material
SC
Spring Black Wire ,TSG 3531G SWB .WIRE/SBS3/0600.Correct Diameter 6.0mm +/- 0.06mm.No Score Marks. No rust on Wire. Tensile range = 1226 to 1422mpa
Visual Inspection / Micrometer
As per incoming raw material inspection plan
Every Consignment
3075
1120
Goods Receive Notbook / Buff tag and record findings on incoming receiving inspection sheet
Any non-conforming raw material shall be placed on hold and isolated. Raise a SRAN and inform Stores Coordinator
5
Move raw material to dedicated area for storage
Storage
Raw Material
Safe stacking of wire coils onto racks as per allocated areas and FIFO system
Visual Inspection
As per FIFO system
On receiving
FIFO information board and Rack Identification
Any difficulty experienced during this activity report to Stores Coordinator
6
Issue Wire to production
Issuing
Raw Material
Correct wire to be issued as per the job card
Verification as per buff tag Measure wire diameter with vernier
Every coil issued to production
Every job as per request
Route Card
Should the incorrect wire be issued to production stop process, correct and inform Stores Coordinator
7
Form wire on Huron
Forming
Wire Form
SC
Form wire as per checking fixture and work instructions. Wire must sit in the slots and flush around the pin. Width dimension of leg outside to outside after LTHT shall be 273.3mm + 10mm.
Visual Inspection of wire coil prior to feeding through machine to ensure it is not tangled. Inspection of wire form in checking Fixture for correct fitment.
First-off, in-process and last-off inspection
1 Part every hour
3077
3079
12389
1105
Record on electronic system
Should he first-off sample fail - stop process and reset machine and redo first-off sample. Inform Supervisor
8
Transport wire forms to LTHT
Transport
Wire Form
Correct handling of wire forms during this activity
Visual Inspection
NA
Every job as per request
NA
Any difficulty experienced during this activity report to supervisor
9
LTHT
Heat Treatment
Wire Forms
SC
Correct temperature 300 degrees Celsius for 20 minutes.
Visual
As per requirements
Every job
1105
Record temperature on log sheet QD52 for every batch
Any non-conformance shall be isolated - raise NCR put a hold card and be placed in quarantine store - Inform Quality.
10
Transport wires forms to assembly area
Transport
Wire Forms
Correct wire forms, correct quantity as per job request
Visual Inspection
NA
As per job request
NA
Should any difficulty occur during transportation inform supervisor
11
Assemble wire form on mould plate
Assembly
Wire Form
SC
Assemble as per work instruction. Do not force fit the part into the fixture. Legs and front portion shall be pararalell and flat. Mould plate secure on part.
100% inspection on assembly
Every batch
Every order
1104
N/A
Any discrepancies shall be reported to supervisor
12
Inspection of assembled parts
Inspection
Inspection
SC
Must conform to checking fixture requirements. Legs must be paralell. Front portion must sit flat.
Visual Inspection and verification on final checking fixture. First-off verification by Q.A
First-off inspection In process inspection and last off
In process, 1 frame every hour
3080
3081
12390
1104
Record on electronic system
Any difficulty experienced during this activity report to supervisor
13
Pack parts into dunnage
Packing
Completed Parts
Correct quantity. 12 Seat backs per bin. Bin No 4633
Visual
As per WIS
Every job
1104
F/A Card
Should the quantity be incorrect stop process, verify quantity and add/remove frames to meet quantity required
14
Transport parts to stores
Transport
Competed Parts
Correct Dunnage and quantity
Visual inspection
As per works order
Every Batch
F/A Card
Should any difficulty occur during transportation inform supervisor
15
Receipt parts to stores
Receipting
Completed parts
Correct quantity be entered into the system
Visual
Every batch
Every order
1094
F/A Card
Any discrepancies shall be reported to stores co-ordinator
16
Dispatching of parts
Transport
Completed Parts
Correct loading of boxes and safe handling during transport activity
Visual
Entire Batch
Every new order
1101
Delivery Note / Invoice
Any difficulty experienced during this activity report to Stores Coordinator
17
Layout function inspection
Inspection
Inspection
Full Dimension
As per fixture and customer requirements
1 Complete part
As per schedule
Audit sheet
Should the functional layout fail, the production manager shall be informed immediately
Process Flow
Select Process Flow
Process No
Process Name
Work Element
Check Item
Rank
Process Criterion
Inspection Method
Inspection Plan
Frequency
Responsible Person
Confirmation Level
Checksheet
Reaction Plan
Error
Approve Draft Document
Revision Comments :
Enter Pin No :
SAFETY FIRST
NEWS
Singakwenza Feedback Due
Marco Training Monday
Improvement Projects Due