Webroy Quality System
INDEX |
CARS |
GRID VIEW |
DASHBOARD |
PRODUCTION SYSTEM |
QUALITY MANUAL |
SUGGESTIONS |
MANUFACTURING QUALITY CHART
COMPILED BY
Compiled By
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 2
Team Member 2
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 3
Team Member 3
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 4
Team Member 4
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
SUPPLIER
Webroy (Pty) Ltd
MQC No
CUSTOMER
Customer
A001-Adient-Pasdec
C007-Gabriel
E010-Engineering Plastics
F001-Federal Mogul
F002-Feltex
H006-BT Industries
I002-Isringhausen
J002-Adient South Africa
L001-Lear
L016-L&J
N001-Nissan
R004-Ramsay
T004-Toyota Boshoku South Africa
T014-Toyota South Africa Motors
REV No.
PART NAME
DATE INITIATED
PART No.
REVISION DATE
2023/08/23
LAST REVIEW DATE
WEBROY STOCK CODE
STATUS
Select Status
PROTO-TYPE
PRE-LAUNCH
PRODUCTION
MANUFACTURING LOCATION
Webroy
SAFETY CRITICAL
MQC TYPE
Select MQC Type
Process
Product
Current
Process Flow Key
Process Type
Image
PARTS STOCK
COMPONENT PART
PROCESS OPERATION
SAMPLING INSPECTION
100% INSPECTION
TRANSPORT
Responsible
Confirmation Level Key
Name
Image
OPER
T/L
SUPERVISOR
MNGR
OPER
T/L
SUPERVISOR
MNGR
PROCESS FLOW
NO
NAME
WORK ELEMENT
CHECK ITEM
RANK
PROCESS CRITERION
INSPECTION METHOD
INSPECTION PLAN
FREQUENCY
Inspection No.(s)
Work Instructions
RESP
CHECK SHEET
CONFIRM'N LEVEL
REACTION PLAN
1
Receiving raw material
Receiving
Receiving
Check correct quantity delivered, type and diameter
Visual inspection and verification as per order
Delivery Note and order
Every batch
Goods Receive Note Book / Delivery Note
If non-compliant contact supplier and inform Quality Manager
2
Move raw material to incoming inspection area
Transport
Transport
Store material properly
Visual inspection
AS per procedures
Every batch
Visual Inspection
If difficulty occurs in storing raw material properly, inform Stores Coordinator
3
Raw material incoming inspection by QA Personnel
Inspection
Inspection
Correct Diam. 3.2mm Correct type : SWB No rusty wire / no score marks / no excessive drawing soap
Visual inspection Micrometer
As per incoming raw material inspection plan
Every Consignment
Goods Receive Note Book / Record findings onm incoming inspection record sheet
Any non-conforming raw material shall be isolated, properly tagged and placed in quarantine. Inform Quality Manager
4
Move raw material to storage area for safe stacking
Transport
Transport
Safe handling of raw material during transport
Visual inspection
Every job
On receiving
N/A
Any difficulty experienced during activity report to Stores Coordinator
5
Issue raw material to Production Personnel
Issuing
Issuing
Correct wire to be issued as per job card Wire/SBS3/3.2
Verification of wire size with vernier
Every coil issued to production
Every Coil
Job card
Should the incorrect wire be issued to production stop process, correct and inform Stores Coordinator
6
Form spring
Forming
Forming
Formed spring should be 390mm-395mm.No burrs or sharp edges
Measure the length with tape measure.Visual check no sharp edges or burrs
First off & In-process inspection Bend as per work instruction WR/PWI/251
5 every 1 hour
Record on attribute inspection sheet QD203
Should the first off sample fail, stop process, reset machine and redo first off sample. Inform Supervisor
7
Move spring to End bend
Transport
Transport
Safe handling of spring during transport
Visual inspection
Visual inspection during transport
Every job
N/A
Any difficulty experienced during this activity report to supervisor
8
Bend spring
Bending
Bending
CC
Bend spring as per work instruction WR/PWI/251
Visual inspection
As per work instruction WR/PWI/251
Every job
BIS Card
Should any difficulty occur during transportation inform supervisor
9
Move spring to LTHT
Transport
Transport
Safe handling of spring during transport. Part identification in place
Visual inspection
Entire batch
Every job
N/A
Should any difficulty occur during transportation inform supervisor
10
Heat treatment
Heating
Heating
Correct temperature 300 deg. Celsius for 20 minutes
Visual inspection
Every load
Every order
QD:52
Any discrepancy shall be reported to supervisor
11
Transport spring to stretching process
Transport
Transport
Correct loading of boxes and safe handling during transport activity
Visual inspection
Every batch
Every order
N/A
Any difficulty experienced during this activity report to supervisor
12
Stretch spring
Stretching
Stretching
Stretch spring as per work instruction WR/PWI/251 Length after stretching 387.5mm-392.5mm
measure the lenght with tape measure
Entire bach
5 Every hour
record on attribute inspection sheet QD.203
Any discrepancy report to supervisor
13
Inspect spring
Inspection
Inspection
Inspect Part no burrs correct lenght,correct box its in(KLTD-4616) wire as per work instruction WR/PWI/251
Visual inspection and check using checking fixture
First-off
Every spring
N/A
Any difficulty report to supervisor
14
Move spring to stores
Transport
Transport
Safe handling of springs during transport activity
Visual inspection
Every batch
Every order
F/A Card
Should any difficulty be experienced during this activity report to Store Coordinator
15
Receipt stock
Capture
Capture
Correct quantity to be captured in to the stock system
Visual
Every load
Every order
F/A Card
Any discrepancy shall be reported to the Stores Coordinator
16
Prepare order
Prepare
Prepare
Correct quantity and correct spring picked and packed
Visual
Every batched picked
Every order
Sales Order / Delivery note
Any difficulty during this activity report to Stores Coordinator
17
Transport to customer
Transport
Transport
Correct loading of boxes and safe handling during transport
Visual inspection
Every order
Every delivery
Delivery Note
Any difficulty during this activity report to Stores Coordinator
Process Flow
Select Process Flow
Process No
Process Name
Work Element
Check Item
Rank
Process Criterion
Inspection Method
Inspection Plan
Frequency
Responsible Person
Confirmation Level
Checksheet
Reaction Plan
Error
Approve Draft Document
Revision Comments :
Enter Pin No :
SAFETY FIRST
NEWS
Singakwenza Feedback Due
Marco Training Monday
Improvement Projects Due