MANUFACTURING QUALITY CHART
COMPILED BY
Compiled By
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 2
Team Member 2
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 3
Team Member 3
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 4
Team Member 4
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
SUPPLIER
Webroy (Pty) Ltd
MQC No
CUSTOMER
Customer
A001-Adient-Pasdec
C007-Gabriel
E010-Engineering Plastics
F001-Federal Mogul
F002-Feltex
H006-BT Industries
I002-Isringhausen
J002-Adient South Africa
L001-Lear
L016-L&J
N001-Nissan
R004-Ramsay
T004-Toyota Boshoku South Africa
T014-Toyota South Africa Motors
REV No.
PART NAME
DATE INITIATED
PART No.
REVISION DATE
2023/08/25
LAST REVIEW DATE
WEBROY STOCK CODE
STATUS
Select Status
PROTO-TYPE
PRE-LAUNCH
PRODUCTION
MANUFACTURING LOCATION
Webroy
SAFETY CRITICAL
MQC TYPE
Select MQC Type
Process
Product
Current
Process Flow Key
Process Type
Image
PARTS STOCK
COMPONENT PART
PROCESS OPERATION
SAMPLING INSPECTION
100% INSPECTION
TRANSPORT
Responsible
Confirmation Level Key
Name
Image
OPER
T/L
SUPERVISOR
MNGR
OPER
T/L
SUPERVISOR
MNGR
PROCESS FLOW
NO
NAME
WORK ELEMENT
CHECK ITEM
RANK
PROCESS CRITERION
INSPECTION METHOD
INSPECTION PLAN
FREQUENCY
Inspection No.(s)
Work Instructions
RESP
CHECK SHEET
CONFIRM'N LEVEL
REACTION PLAN
1
Receiving raw material
Receiving
Raw material
Check correct quantity delivered, type and diameter
Visual inspection and verification as per order
Delivery Note and order
Every batch
1090
1090
1090
1090
Goods Receive Note Book / Delivery Note
If non-compliant contact supplier and inform Quality Manager
2
Move raw material to incoming inspection area
Transport
Raw material
Store material properly
Visual inspection
AS per procedures
Every batch
Visual Inspection
If difficulty occurs in storing raw material properly, inform Stores Coordinator
3
Raw material incoming inspection by QA Personnel
Inspection
Raw material
Spring black wire. TSG 3531G - SWB. WIRE/SBS3/0380. Correct diameter 3.8mm +/- 0.035. No score marks, no rust on wire. Correct tensile - 1373mpa to 1569mpa.
Visual inspection Micrometer
As per incoming raw material inspection plan
Every Consignment
6080
1120
Record on on-line inspections
Any non-conforming raw material shall be isolated, properly tagged and placed in quarantine. Inform Quality Manager
4
Move raw material to storage area for safe stacking
Transport
Raw material
Safe handling of raw material during transport
Visual inspection
Every job
On receiving
N/A
Any difficulty experienced during activity report to Stores Coordinator
5
Issue raw material to Production Personnel
Issuing
Raw material
Correct wire to be issued as per job card
Verification of wire size with vernier
Every coil issued to production
Every Coil
Job card
Should the incorrect wire be issued to production stop process, correct and inform Stores Coordinator
6
Form product
Forming
Product
SC
Formed spring should be 359.30 mm - 364.30 mm (end to end), No Burrs on Part
Measure with tape measure
First off,in-process and last off.
1 every hour
6243
6244
6245
1155
Record on-line inspections
Should the first off sample fail, stop process, reset machine and redo first off sample.if any burrs Inform Supervisor to raise job card and send tool to workshop
7
Move product to End bend
Transport
Product
Safe handling of spring during transport
Visual inspection
Visual inspection during transport
Every job
N/A
Any difficulty experienced during this activity report to supervisor
8
Form ends
Bending
Product
Form ends as per work instruction
Visual inspection
As per work instruction
Every job
20453
20454
20455
1155
Record on electronic system
Should any difficulty occur during transportation inform supervisor
9
Move product to LTHT
Transport
Product
Safe handling of spring during transport. Part identification in place
Visual inspection
Entire batch
Every job
N/A
Should any difficulty occur during transportation inform supervisor
10
Heat treatment
Heating
Heating
Correct temperature 300 deg. Celsius for 20 minutes
Visual inspection
Every load
Every order
1155
N/A
Any discrepancy shall be reported to supervisor
11
Transport product to stretching process
Transport
Product
Correct loading of boxes and safe handling during transport activity
Visual inspection
Every batch
Every order
N/A
Any difficulty experienced during this activity report to supervisor
12
Stretch & Inspect product
Stretching
Product
Stretch spring as per work instruction 1155 Overall length after stretching is 359.30 mm - 364.30 mm.
Check in checking fixture
Entire bach
Every spring
20456
20457
20458
1155
N/A
Any discrepancy report to supervisor
13
Move product to stores
Transport
Product
Safe handling of springs during transport activity
Visual inspection
Every batch
Every order
F.A Card
Should any difficulty be experienced during this activity report to Store Coordinator
14
Receipting product to stores
Receipting
Product
Correct quantity to be entered on to the stock system
Visual
Every batch
Every order
F/A Card
Any discrepancy shall be reported to the Stores Coordinator
15
Dispatching of products
Transport
Prodcut
Correct loading of bins and safe handling during transport activity
Visual
Entire order
Every order
Delivery note / invoice
Any difficulty during this activity report to Stores Coordinator
16
Layout functional inspection
Inspection
Product
Full dimensional
As per customer requirements
As per customer requirements
As per schedule
Audit sheet
Should the functional layout fail the Production manager shall be informed immediately.
Process Flow
Select Process Flow
Process No
Process Name
Work Element
Check Item
Rank
Process Criterion
Inspection Method
Inspection Plan
Frequency
Responsible Person
Confirmation Level
Checksheet
Reaction Plan
Error
Approve Draft Document
Revision Comments :
Enter Pin No :