Webroy Quality System
INDEX |
CARS |
GRID VIEW |
DASHBOARD |
PRODUCTION SYSTEM |
QUALITY MANUAL |
SUGGESTIONS |
MANUFACTURING QUALITY CHART
COMPILED BY
Compiled By
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 2
Team Member 2
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 3
Team Member 3
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 4
Team Member 4
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
SUPPLIER
Webroy (Pty) Ltd
MQC No
CUSTOMER
Customer
A001-Adient-Pasdec
C007-Gabriel
E010-Engineering Plastics
F001-Federal Mogul
F002-Feltex
H006-BT Industries
I002-Isringhausen
J002-Adient South Africa
L001-Lear
L016-L&J
N001-Nissan
R004-Ramsay
T004-Toyota Boshoku South Africa
T014-Toyota South Africa Motors
REV No.
PART NAME
DATE INITIATED
PART No.
REVISION DATE
2024/09/26
LAST REVIEW DATE
WEBROY STOCK CODE
STATUS
Select Status
PROTO-TYPE
PRE-LAUNCH
PRODUCTION
MANUFACTURING LOCATION
Webroy
SAFETY CRITICAL
MQC TYPE
Select MQC Type
Process
Product
Current
Process Flow Key
Process Type
Image
PARTS STOCK
COMPONENT PART
PROCESS OPERATION
SAMPLING INSPECTION
100% INSPECTION
TRANSPORT
Responsible
Confirmation Level Key
Name
Image
OPER
T/L
SUPERVISOR
MNGR
OPER
T/L
SUPERVISOR
MNGR
PROCESS FLOW
NO
NAME
WORK ELEMENT
CHECK ITEM
RANK
PROCESS CRITERION
INSPECTION METHOD
INSPECTION PLAN
FREQUENCY
Inspection No.(s)
Work Instructions
RESP
CHECK SHEET
CONFIRM'N LEVEL
REACTION PLAN
1
Receiving raw material - Stores Personnel
Receiving
Raw material
Check for correct quantity delivered, type and diameter.
Visual inspection and verification as per order
Delivery Note and order
Every Batch
1090
Goods Receive Note Book / Delivery Note
hould there be any discrepancies inform production planner / supplier immediately and make a note on P.O.D
2
Move material to receiving storage area
Transport
Raw material
Store material correctly
Visual Inspection
As per FIFO System
Every Batch
Visual inspection
If difficulty occurs in storing raw material properly inform Stores Coordinator
3
Inspection of raw material by QA personel
Inspection
Raw material
SC
Correct Diam 3.8mm (+- 0.035mm) Correct - Spring wire. EN 10270-1. WIRE/SBS3/0380. Correct tensile - 1373mpa to 1569mpa - No rusty wire / no score marks
Visual Inspection / Micrometer
As per incoming raw material inspection QD207
Every consignment
6080
1120
Goods receive notebook / Buff tag and record findings on electronic sytem
Any non-conforming raw material shall be placed on hold and isolated. Raise SRAN and inform Stores Coordinator
4
Move raw material to dedicated area for storage
Transport
Raw material
Safe stacking of wire coils as per allocated areas and FIFO system
Visual Inspection
As per FIFO System
On receiving
Identification tags
Any difficulty experienced during this activity report to Stores Coordinator
5
Issue wire to production
Issuing
Raw material
Correct wire to be issued as per route card.
Verification as per buff tag. Setter to verify wire diameter with correct micrometer/vernier caliper.
Every coil issued to production.
Every job as per request
Route Card
Should the incorrect wire be issued to production stop process, correct and inform Stores Coordinator
6
Form wire on Wire Former
Forming
Forming
SC
As per fitment in checking fixture
Visual inspection.
First Off In process inspection of 2 parts and last-off
Every kanban trolley
20475
20476
20477
1164
Record on BIS card
Should any incorrect part be formed stop process. report to team leader.
7
LTHT
Stress relieve
Stress relieve
SC
Correct temperature 300C (+- 20C) for 15 minutes
Visual inspection of oven temperature
Visual inspection of temperature.
Every batch
Visual verification
Any difficulty experienced during this activity stop the process and report to team leader
8
Load wire forms on kanban
Loading
Loading
Load wires correctly on kanban. Correct wires loaded onto kanban.
Visual inspection after LTHT.
Full Kanban
Every batch
NA
Any difficulty experienced during this activity stop the process and report to team leader
9
Load wire forms into mould
Loading
Wire forms
Correct loading of wire forms
Visual inspection
As per work instruction
Every part
N/A
Any difficulty experienced during this activity stop the process and report to team leader
10
Moulding of wire forms
Moulding
Moulded seat cushion
SC
Correct injection as per requirement. Correct Mould parameter settings. Correct purging and pre check. Plastic hopper temperature control = 79 - 83 Degrees.
Visual Inspection.
As per job requirement
Every part
20461
20474
1203
Record on online inspection system
Any difficulty experienced during this activity stop the process and follow stop, call wait procedure.
11
Strip part from mould and inspect
Stripping and inspecting
Moulded product
Correct injection No missing pieces of plastic No sprue, No sharp edges Overmoulded wires to be completely covered, look for under shooting. Ref. CAR 48363
Visual Inspection
1 Finished part
Every part
16456
16458
16460
1194
Record on online inspection system
Any difficulty experienced during this activity stop the process and report to team leader
12
Load parts into bin
Packing
Completed products
Correct quantity 15 parts per bin / 25 bins per pallet
Visual inspection
As per works order
Every job as per request
FA Card
Any difficulty experienced during this activity stop the process and report to team leader
13
Transport part to stores
Transport
Completed products
Correct bins and correct quantity
Visual in spection
As per works order
Every order
FA Card
Any difficulty experienced during this activity stop the process and report to Supervisor
14
Receipt parts into stores
Receipting
Completed parts
Correct quantity to be entered into stock system
Visual
Every batch.
Every order
1094
FA Card
Any discrepancy shall be reported to stores coordinator
15
Dispatching of parts
Transport
Completed parts
Correct loading of boxes and safe handling during transport activity
Visual
As per job order
Every order
1101
Delivery note / Invoice
Any difficulty experienced during this activity report to Stores Coordinator
16
Layout function inspection
Inspection
Inspection
Full dimensional
As per drawing and customer requirements
1 Complete part
As per schedule
Audit sheet
Should the functional layout fail, the production manager shall be reported immediately.
Process Flow
Select Process Flow
Process No
Process Name
Work Element
Check Item
Rank
Process Criterion
Inspection Method
Inspection Plan
Frequency
Responsible Person
Confirmation Level
Checksheet
Reaction Plan
Error
Approve Draft Document
Revision Comments :
Enter Pin No :
SAFETY FIRST
NEWS
Singakwenza Feedback Due
Marco Training Monday
Improvement Projects Due