PROCESS FLOW | NO | NAME | WORK ELEMENT | CHECK ITEM | RANK | PROCESS CRITERION | INSPECTION METHOD | INSPECTION PLAN | FREQUENCY | Inspection No.(s) | Work Instructions | RESP | CHECK SHEET | CONFIRM'N LEVEL | REACTION PLAN | |
| 1 | Receiving and verification of raw material | Receiving | Raw material |
| Check for correct quantity delivered, type and diameter | Visual inspection and verification as per order | Delivery note and order | Every batch |
|
1090
|
| Goods receive notebook / delivery note |
| Should there be any discrepancies inform production planner / supplier immediately and make a note on P.O.D |
|
| 2 | Move material to receiving storage area | Transport | Raw material |
| Store material correctly | Visual inspection | As per FIFO system | Every batch |
|
|
| Visual inspection and FIFO board |
| If difficulty occurs in storing raw material properly inform Stores Coordinator |
|
| 3 | Inspection of raw material by QA personnel | Inspection | Raw material |
| SPEC. TSG3533G. Material. WIRE/MBH2/0800
SAE 1008 - 8.0mm +/- 0.08mm. Tensile range 550mpa to 750mpa
No pitted rust, now score marks, no excessive drawing soap
Phosphate coating as per CAR3/18 | Visual inspection
Micrometer | As per incoming raw material inspection | Every consignment |
6179
|
1120
|
| Record on inspection system |
| Any non-conforming raw material shall be placed on hold and isolated. Raise SRAN and inform Stores Coordinator |
|
| 4 | Move raw material to dedicated area forstorage | Storage | Raw material |
| Safe stacking of wire coils on to racks as per allocated areas and FIFO system | Visual inspection | As per FIFO system | On receiving |
|
|
| FIFO information board and rack identification |
| Any difficulty experienced during this activity report to Stores Coordinator |
|
| 5 | Issue wire to production | Issuing | Raw material |
SC
| Correct wire to be issued as per job card | Verification as per buff tag
Setter to measure wire diameter with vernier | Every coil issued to production | Every coil |
|
|
| Route card |
| Should the incorrect wire be issued to production stop process, correct and inform Stores Coordinator |
|
| 6 | Form on 12mm Huron | Forming | Product |
SC
| Front end must sit flat when placed on a flat surface. Height (taken from center of pin on CF block must measure 9.- 9.5mm. Front section must sit flat on CF block. Gap on front section must be equal and a 5mm pin must not fit through. Moulded end must be parallel as per CAR 53471. | Visual, vernier and angle finder.
| First-off - 5 parts, which is sent through each process to check notching and wire movement.
5 parts to be stamped and coated for each batch
| First-off at start of production. In-process 9 parts every hour and last-off |
144231542315424
|
1064
|
| Record on Electronic system |
| Should the first-off sample fail stop process and reset machine and re-do first-off |
|
| 7 | Notching process | Notching | Notched area |
| Correct dimensions on notch as per drawing. Depth of notch 6mm +- 0.02mm as per drawing. No burr after cropping, max burr 0.2mm. correct placement of the parts in the grooves and correct position in order to be notched correctly. | Visual check as per Work instructions.
Check for burrs using measuring Gauge No. SPRG/TOYO/0064
Vernier | As per work instruction | First-off at start of production. In-process 1 part every hour and last-off |
1041608912399
|
1065
|
| Record on Electronic system |
| Any difficulty notching stop process and inform supervisor |
|
| 8 | Washing | Cleaning Tanks | Products |
| Remove oil and rust. Check chemical PH and temps are to specification.
If grease remains increase wash time (CAR 3/18 & 2/18) | Visual inspection. Refer to work instruction | Every batch | Daily |
|
1069
|
| Record on QD329 Expoxy Process Parameters |
| Any difficulty during washing stop process and inform supervisor |
|
| 9 | Epoxy coating of rods | Coating | Coated rods |
SC
| Line speed 43-35 sec/m
Oven temperature 190-200 deg
Smooth finish, check for pin holes, ripples, score marks
Coating thickness 80-125 microns. Refer to work instruction | Visual inspection
Coating thickness gauge | Coating thickness test 5 readings per rod | 1 Rod hood per batch |
10426090
|
1143
|
| Record process parameters on QD329
Record thickness on system |
| Any difficulty during this process report to supervisor |
|
| 10 | Moulding process and final inspection | Moulding | Product |
SC
| Check process parameters on QD329.
Check for burrs after mould on part
Remove flash
Check for pinch point below moulded part
Fits checking fixture. sliding bar must slide through freely on angle check, angle on mouldd section shall be 32 - 40 degrees (reference). Refer CAR No. 53438. | 100% Visual inspection of parts in the checking fixture. | 100% check in checking fixture. | Every part |
1043609112388
|
10631205
|
| Record every hour on Electronic system |
| Any difficulty experienced during this activity report to Supervisor |
|
| 11 | Load pull test | Load pull | Load pull |
SC
| Check load > 1000N minimum | Pull test | 1 Part | Weekly |
|
|
| Record results on Load test record sheet QD:304 |
| Any difficulty experienced during this activity report to supervisor |
|
| 12 | Taping of sponge | Taping | Product |
| Correct fitment of sponge as per drawing
Sponge should have no gap after fitment | Visual and using checking fixture POKE YOKE device (PY001) for sponge fitment (CAR15/18). PY001 verified every 12 months | As per work instruction | Ever rod hood |
|
1063
|
| Record every hour on Electronic system |
| Any difficulty experienced during this activity report to Supervisor |
|
| 13 | Packing of final product | Packing | Products |
| Correct quantity 22 products per bin
Blue Bin No 4122
10 bins per pallet | Visual | As per work instruction | Every job |
|
1063
|
| F/A Card |
| Should the quantity be incorrect, stop process, verify quantity and add/remove products to meet quantity required |
|
| 14 | Transport product to stores | Transport | Products |
| Correct bins and correct quantities | Visual inspection | As per works order | Every batch |
|
|
| F/A Card |
| Should difficulty occur during transport inform Supervisor |
|
| 15 | Receipting product to stores | Receipting | Products |
| Correct quantity to be entered on to the stock system | Visual | Every batch | Every order |
|
1094
|
| F/A Card |
| Any discrepancies shall be reported to the Stores Coordinator |
|
| 16 | Dispatching of products | Transport | Products |
| Correct loading of bins and safe handling during transport activity | Visual | Entire order | Every order |
|
1101
|
| Delivery note / invoice |
| Any difficulty experienced during this activity report to Stores Coordinator |
|
| 17 | Layout functional inspection | Inspection | Product |
SC
| Full dimensiomal | As per customer requirements | 1 Complete product | As per schedule |
|
|
| Audit sheet |
| Should the functional layout fail the Production manager shall be informed immediately. |
|