Webroy Quality System
INDEX |
CARS |
GRID VIEW |
DASHBOARD |
PRODUCTION SYSTEM |
QUALITY MANUAL |
SUGGESTIONS |
PROCESS FLOW DIAGRAM
COMPILED BY
Compiled By
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 2
Team Member 2
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 3
Team Member 3
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 4
Team Member 4
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
SUPPLIER
Webroy (Pty) Ltd
MQC No
CUSTOMER
Customer
A001-Adient-Pasdec
C007-Gabriel
E010-Engineering Plastics
F001-Federal Mogul
F002-Feltex
H006-BT Industries
I002-Isringhausen
J002-Adient South Africa
L001-Lear
L016-L&J
N001-Nissan
R004-Ramsay
T004-Toyota Boshoku South Africa
T014-Toyota South Africa Motors
DRAWING LEVEL
PART NAME
REV No.
PART No.
DATE INITIATED
LAST REVIEW DATE
WEBROY STOCK CODE
REVISION DATE
2019/09/02
MANUFACTURING LOCATION
Webroy
STATUS
Select Status
PROTO-TYPE
PRE-LAUNCH
PRODUCTION
MQC TYPE
Select MQC Type
Process
Product
SAFETY CRITICAL
Current
Process Flow Key
Process Type
Image
PROCESS
MOVE
STORE
INSPECT
STEP
Cost Centre
PROCESS
OPERATION DESCRIPTION
CLASS
PRODUCT AND PROCESS CHARACTERISTICS
CONTROL METHODS
1
500
Receiving raw material by stores person
SC
4,0mm +/- 0,08mm - Hard drawn Mild Black wire
Verification of delivery note and order placed. Any discrepancy - contact supplier and resolve
28
500
Move materials to receiving storage area
SC
Safe handling during transport and handling activity
Visual inspection
29
505
Inspection of raw material by QA Personnel
4,0mm +/- 0,08mm - Hard drawn Mild Black wire Verify as per COA No score marks, no rusty wire - compare tensile strength with COA and spec - Correct grade
Check wire diam. With micrometer - visual inspection of condition of wire - COA from supplier - record on incoming inspection document. Rod spec from supplier
45
500
Move raw material to storage area
Safe handling and loading during this activity
Visual inspection during this activity. Competent Hyster driver. FIFO System to control material
46
500
Issue wire to production
Correct identification of wire
Material buff tage, visual inspection
63
15
Load wire coil onto swift at Zukron machine
Safe loading and handling during this activity
Visual inspection during this activity. Competent Hyster driver
64
15
Start Production
As per checking fixture
Visual inspection on in-process checking fixture
80
15
In process inspection
As per checking fixture
Visual inspection on in-process checking fixture
81
6
Call up 60% welding program from control unit at robotic welder
Correct weld programme
Visual verification by operator
97
6
Load welding jig and manufacture first off sample
CC
First off sample must conform to drawing specification
Verification on checking fixture. Record on BIS card
98
6
Inprocess inspection of finished products
CC
Product must conform to drawing specifications
Visual verification on final checking fixture. 100% inspection during production
113
6
Pack conforming parts into card board boxes
As per packaging specification
Product Description as per specification
114
6
Move completed boxes to stores
Safe loading and transporting of frames
Visual
126
50
Receive boxes into storage area for shipment
Correct quantities packed
Manual count on qty required
127
500
Invoice and ship products to customer
As per order placement
Verification of quantities as per sales and delivery note
137
505
Functional Layout inspection
All requirements as stipulated on the drawing and customer requirements
Competent QC conducting inspections accredited sub-contractors conducting tests
Process Flow
Select Process Flow
Cost Centre
Process No
Process Name
Rank
Process Criterion
Inspection Method
Error
Approve Draft Document
Revision Comments :
Enter Pin No :
SAFETY FIRST
NEWS
Singakwenza Feedback Due
Marco Training Monday
Improvement Projects Due