Webroy Quality System
INDEX |
CARS |
GRID VIEW |
DASHBOARD |
PRODUCTION SYSTEM |
QUALITY MANUAL |
SUGGESTIONS |
PROCESS FLOW DIAGRAM
COMPILED BY
Compiled By
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 2
Team Member 2
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 3
Team Member 3
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
TEAM MEMBER 4
Team Member 4
Rob Royston
Phillip Pillay
Gary Royston
Hakeem Francis
Beverly Simes
Christophina Harry
Faizel Khan
Julian Pillay
Reuben Moodley
Hamendra Hariprasad
Ashtique Maniram
SUPPLIER
Webroy (Pty) Ltd
MQC No
CUSTOMER
Customer
A001-Adient-Pasdec
C007-Gabriel
E010-Engineering Plastics
F001-Federal Mogul
F002-Feltex
H006-BT Industries
I002-Isringhausen
J002-Adient South Africa
L001-Lear
L016-L&J
N001-Nissan
R004-Ramsay
T004-Toyota Boshoku South Africa
T014-Toyota South Africa Motors
DRAWING LEVEL
PART NAME
REV No.
PART No.
DATE INITIATED
LAST REVIEW DATE
WEBROY STOCK CODE
REVISION DATE
2021/01/25
MANUFACTURING LOCATION
Webroy
STATUS
Select Status
PROTO-TYPE
PRE-LAUNCH
PRODUCTION
MQC TYPE
Select MQC Type
Process
Product
SAFETY CRITICAL
Current
Process Flow Key
Process Type
Image
PROCESS
MOVE
STORE
INSPECT
STEP
Cost Centre
PROCESS
OPERATION DESCRIPTION
CLASS
PRODUCT AND PROCESS CHARACTERISTICS
CONTROL METHODS
1
500
Receiving and verification of raw material by stores personel
CC
Mild Black Wire 4.0mm mild black wire as per purchase order
Verification of delivery note and order placed . Any discrepancy
2
500
Move material to receiving storage area
CC
Safe handling during transport and handling activity
Visual inspection
3
505
Inspection of raw material by Q.A
CC
Mild black 4mm wire , wire tolerance +/- 0.05mm , No score marks , no rusty wire , compare tensile strength with COA and spec - correct grade
Check wire diameter with micrometer. Visual inspection of condition of wire. COA from supplier. Record on incoming inspection document. Rod spec from supplier
4
500
Move raw material to storage area for storage
CC
Safe loading and handling during this activity
Visual inspection during this activity . Competent forklift driver , FIFO system to control material
5
500
Issue wire to production
Correct identification of wire
Material buff tag Visual inspection
6
15
Select 4mm tooling / select 50% T6 programme and set machine - Zukron / Huron to form individual wires
Correct setting of machine Products to conform to checking fixture
Record on BIS Card and Attribute sampling sheet QD:203 Checking fixture verification
7
15
Start production
SC
Products need to conform to checking fixture / drawing specifications
Checking fixture - visual verification
8
15
Send loops to supplier for over moulding of products
As per drawing requirements
Visual inspection and measurement at supplier
9
500
Receive over moulded products from supplier , receipt into stock
Products must conform to drawing specifications
Visual inspection
10
500
Issue loops to production
Safe handling and packing of products
Visual inspection
11
6
Call - up 50% welding programme from call unit at robotic welder
Ensure correct programme is selected
Visual verification
12
6
Load welding jig , weld and in-process inspection of finished frames
SC
First-off sample must conform to drawing requirements
Verification on checking fixture - record on BIS Card . Should the parts not fit the checking fixture , stop process and report to supervisor
13
6
Pack products into carboard boxes
As per packaging requirements
Description of product as per packaging requirments
14
6
Move completed boxes to stores using pallet jack
Safe loading and transporting of frames
Visual verification
15
500
Receive boxes into stores area for shipment
Correct quantities of frames
Visual inspection Approved transporter
16
500
Dispatching of frames
Safe handling of boxes during this activity
Verification of quantities as per sales order and delivery note
17
505
Lay-out inspection
All requirement stipulated on drawing and customer requirements
Competent Q.A personnel conducting inspections
Process Flow
Select Process Flow
Cost Centre
Process No
Process Name
Rank
Process Criterion
Inspection Method
Error
Approve Draft Document